Design and installation of ducted horizontal directional drills beneath Monks brook Fleming park Eastleigh (January 2018 - March 2018 ) and the river Itchen Hedge end. Works to include provision of construction haul roads and temporary bridges.
Major road works will commence in November in Hedge end and early in 2018 in Eastleigh.
Affected Roads
- Derby road
- Magpie lane … Read More
To install both single and double 33Kv cable circuits with fibre optic cables between Fernfurst and Plaistow substatioins.
Scope of works
Excavate ,install ducts,backfill and reinstate trenches,joint bays and all other associated works and to install cables,joint and test all cable circuits .
Route selection
Every effort has been made to keep the 25 Klm proposed route as short, straight …
Read More- IFA2 will connect the electricity systems of Great Britain and France using high voltage direct current (HVDC) cables from Normandy in France to Fareham in Hampshire.
- In Great Britain, the grid connection point will be a new substation at an existing National grid site off Chilling lane near Warsash , Hampshire.
- The converter station will be on a site … Read More
- Fleet camberley 132Kv Gas Cable Replacement Project
- Major cable works for SSEN
- Fleet - Camberley Fernhill lane road closure 4th November for 7 weeks.
- Please contact our project manager Mr Geoff Collie shoulkd yoiu have any special requirements or concers regarding this closure